Tricel Novo 8PE Sewage Treatment Plant

The Tricel Novo sewage treatment plants are well known for their reliability and their easy installation too.

Size Guide

£2,856.00 inc VAT £2,380.00 exc VAT

SKU 8PE Category Tags ,

Description

Tricel Novo 8PE Sewage Treatment Plant

Tricel Novo 8PE sewage treatment plants have a reputation for dependability and ease of installation. The Tricel Novo 8PE sewage treatment plant submerged aeration is suitable for domestic, light commercial, or communal applications and uses simple, proven fixed bed technology. This model is suitable for 8 people and will be a successful septic tank replacement system for your old one for many years to come.

Each treatment zone in these high-quality septic tank replacement systems is responsible for a very different stage of the purification process.

How A Tricel Novo Works:

Stage 1: The primary chamber

Anaerobic breakdown occurs in the primary settlement chamber during the first stage of sewage treatment. The solids settle to the bottom after the wastewater is added, separating the liquid from the solids.

Stage 2:  The aeration chamber

Aerobic breakdown is the next step in the wastewater treatment process. In the aeration chamber, large populations of naturally occurring bacteria live in specially designed filter media.

Air, which is continuously supplied by a purpose-built pump in the unit’s top section, keeps the bacteria alive. The bacteria feed on the waste and remove it as the liquid flows slowly through the filter media.

Stage 3:  Final settlement chamber

The liquid flows from the aeration chamber to the final settlement chamber in the final stage of wastewater treatment. Suspended sludge containing bacteria is carried into the settlement chamber with the liquid and settles to the bottom.

The sludge is returned to the primary settlement chamber via a continuous sludge return system. The remaining treated liquid has now passed the Tricel system’s safe exit standard.

Size Guide

Additional information

Size Required

Gravity, Pumped Outlet

Reviews

There are no reviews yet.

Be the first to review “Tricel Novo 8PE Sewage Treatment Plant”

Your email address will not be published. Required fields are marked *

This website uses cookies to ensure you get the best experience on our website: Find out more.